• (+1) 267 481 2669 / 701 659-1106
  • leadersacademyinc1@gmail.com

New classroom ready and being used!!!

The new classrooms are done being built and are being used!!! The outside walls are made of concrete, but the inside walls that separate the room into smaller classrooms are made of wood and can be taken down and put back up. This way, when a large gathering room is needed, the walls can be taken down. When just classrooms are needed, the walls go back up! Several new desks have been built so that all of our students have a desk and a classroom to learn in!! Thanks be to God!!!

Leave a Reply

Your email address will not be published. Required fields are marked *

error: